HYPERLOOP ONE TEST TRACK MANUFACTURNIG

Transport high-speed transportation tube housing through testing processes

LOAD: 55,000 lbs

SOLUTION
Aero-Planks, Aero-Drive and Guide Wheel

BENEFIT

  • Requires just one operator and a spotter to move the unwieldy tubes easily
  • Aero-Planks can be used for other manufacturing moves
  • Minimal training required

 

Read more about the Hyperloop One »


CONTAINER MOVER

Move single or stacked ISO shipping containers through an environmentally controlled storage facility, eliminating crane or winch requirements.

LOAD: 65,000-130,000 lbs.

SOLUTION
A custom engineered load handling system powered by Aero-Drives.

BENEFIT

  • Connects to standard ISO shipping container (ISO 688 and ISO 1161)
  • Omnidirectional and precise movement of stacked containers
  • Eliminates crane and winching requirements
  • Reduced facility construction costs
  • Increased energy conservation reduced overall operating costs

MAIL SORTING MACHINE

Move 50 exceptionally long (up to 30 meters) sorting machines

LOAD: Up to 20 tons per machine

SOLUTION
Air Caster Rigging System with Gapmaster Aero-Casters

BENEFIT

  • Reduced machine move time by 67%
  • Control Console provided better management of long load across uneven flooring
  • Gapmaster Aero-Casters allowed operation on seamed floor

Unique Applications GALLERY