Power Distribution

AeroGo has helped customers around the world to solve their load moving problems in the power distribution industry.  With nearly 50 years of experience, AeroGo has the knowledge and expertise you can rely on to get the job done. Even if your move seems impossible, give us a call - we can help. 

Weight – 250 tons

Load – Transformer

Solution – A manufacturing customer needed to transport power distribution transformers through the manufacturing process (most commonly used for moving in and out of the test cell, and in and out of vapor phase ovens).  AeroGo engineers identified an AeroGo air cushion transporter system as the ideal solution due to its capacity to move transformers up to 800 tons.

The AeroGo Advantage:

  • AeroGo's transformer transporters are the gold standard around the world
  • Sophisticated control system makes it the easiest to use transport system in the
    industry
  • Detailed on-board diagnostics and modular components reduce operating costs
  • AeroGo's global network of service centers provide critical 24/7 support
  • CE and ASME B30.1 Compliant

Preferred supplier to companies such as Duke Energy, Siemens, Progress Energy, and Georgia Power.